We cable an office, a branch, or three ministry towers. It gets cabled once: data, voice, video, and security in one build.
Are you technical? Turn on technical mode in the menu.
Structured cabling
We lay the copper and fiber cabling, the backbone, the technical room, and the LAN and WLAN networks. In plants, offices, branches, and buildings, of any size.
You design it once and it serves everything: data, telephony, cameras, and access control, on the same infrastructure.
Industrial scale
A plant has meters of height, dust, machines, and shifts that never stop. We design for that environment.
How we work
You pay for bad cabling twice: once to install it, once to redo it.
So we survey the site first. We design, install, test, and certify.
We certify every point at handover. The report is yours, along with the drawings of what was built.
With Furukawa cabling, the certified installation comes with a 25-year manufacturer's warranty.
A 50-point office is cabled in 3 days. A 500-point plant, in 4 weeks. The lead times hold if we do the conduit work. If another contractor does the ducts and trays, the clock starts when they finish.
Telephone and internet operators contract us to maintain their fiber: close to 6,000 km, underground and aerial.
Success stories
We cabled the three ministry towers, MOPC, MEC, and the Interior, funded by Itaipú Binacional.
Frigorífico Los Lazos is a new meat-packing plant in Presidente Hayes, built to export. We delivered its entire technology layer: server rooms, cabling, site fiber, and WiFi.
CARDIF, in the Olympic Park, is where Paraguayan football's youth divisions train, 10 pitches on more than 70,000 m². For the Paraguayan Football Association we cabled the grounds, laid the fiber, and installed the WiFi and backup power.
Alorica opened operations in Paraguay with offices in Asunción and Ciudad del Este. We did the electrical installation and data cabling for all of its workstations.
At Chacomer's logistics center in Luque we laid the fiber, cabling and power that link the warehouses on the site, 1.4 km of optical fiber.