Critical power
The power goes out.
Your operation doesn't.
UPS, generation, and automatic transfer: we design the power chain that keeps alive the gear that can't shut off. We built it for Distrito Perseverancia's data center.
Are you technical? Turn on technical mode in the menu.
The power chain
Between the grid and your gear we put a chain: UPS that let no flicker through, metered distribution, and automatic transfer between sources.
A generator starts in seconds. Your servers die in milliseconds. The UPS exists for that gap.
For you, a failure is an alert, not a surprise.
We install the generator too. In a data center it usually goes in together with the UPS.
A small UPS is installed and tested within a week. There is stock in the region. On a large project, 100 kVA, lead times stretch.
Cooling and fire
Precision cooling for equipment rooms: temperature and humidity under control, all the time.
And fire detection and suppression built for data centers. They put out the fire without destroying the gear.
How we work
An undersized UPS reveals itself the day the power goes out.
So we measure your load before we install. We size it, install it, test it, and hand it over.
We test every UPS under load before handing it over. And with a maintenance contract, we stay on: monthly, bimonthly or quarterly visits, whichever you sign, and we warn you before the batteries expire.
The contract is preventive. Parts, whether batteries, a board, or a gas refill, are quoted separately.
That contract also covers a Sunday call-out. Without it, the call-out is quoted.
Success stories
At Distrito Perseverancia's data center we implemented the precision cooling, the UPS, and the fire detection.
For Cooperativa Chortitzer's new data center in Loma Plata, we installed the precision cooling, the backup power, and the fire protection.
Alorica opened two offices in Paraguay, in Asunción and Ciudad del Este. We did the electrical installation for all of its workstations.